Tuesday, December 22, 2009

Chenal

Residential Development
Madison, Mississippi


The following are a few pics of the water feature we designed for the community.






The following are a few pics during construction.




This is the chopped stone selected to go on the walls and fountain.


Pool contractors shooting the gunite into place.


Saint Ives

Residential Development Entrance Feature
Madison, Mississippi
Client:  Matt B. Jensen Companies

I recently came across a few pics I took some time ago of the entrance to Saint Ives.  This project was one of my first designs I worked on after starting the company.



This was one of my first sketches of the entrance.

The client agreed on this sketch to move forward with the construction documents.  Below are a few details from several sheets of documents for construction. 









This rendering was the final graphic used for presenting to the City of Madison and marketing.

Below are a few pics during construction.


Setting the iron arbor that spans over the entry lane.

Some might consider this a bad batch of brick.  Not exactly.  It is a "clinker" brick.  More expensive than the basic regular brick.

We had these "Z" anchors fabricated to secure the limestone corbels onto the walls.

Masons installing the limestone corbels.

Installing the copper finial.

Wednesday, November 18, 2009

Monument/Cell Tower Relocation

Last week, the Washington Monument replica cell tower in Ridgeland was moved with success.  We have been working with the HC Bailey Company for the past year on the new location for the tower.

The tower was moved to allow the new interchange and frontage road along Interstate 55.  What made the relocation impressive is that it was moved in one piece.
A few interesting facts about the tower are:

- The Monument Tower is 195 ft. tall and weighs 120,000 pounds.
- The beams that were welded to the tower and used to move the tower were 21,000 pounds each. Four total 84,000 pounds.
- Two trailers were hooked together on each side of the tower to make the move. Each of these pairs of trailers weighed 140,000 pounds or two sets is 280,000 pounds.
- The total weight that was moved over the road that has been built is 484,000 pounds.
- There are 96 tires per set of trailers or a total of 192 tires on the trailers. When moving the tower each tire will bear 2,520 pounds of weight.

Due to the weekly rain events we have had over the past few months, the contractors placed a boardwalk for the trailers to travel on avoiding the risk of encountering any soft spots throwing the tower off balance.

This is one of the trailers that was used to haul the tower.  The beams on top of the trailer was welded to the base of the tower then adhered to the trailers. 

This picture shows the old location in the foreground with the tower in place at its new location.

If you wonder what the inside of the tower looks like, well here it is.  It is interesting to see how much light still comes in through the edges of the individual panels.

Tuesday, November 17, 2009

Safe Routes to School - (update)

We recently conducted a field review with MDOT (Mississippi Department of Transportation), where we walked through the conceptual plans for the Madison Safe Routes to School Project. We will have one more review with MDOT before our final submittal in January. We are looking forward to what this project will provide for both the students of the Madison Avenue Schools and the community as a whole.

Below are conceptual images we used during the early stages of the project as we met with school officials, parents, and representatives of neighboring communities.

This image shows upgrading the intersection signals with pedestrian crossing signals and replacing the thin stripes with a more dominant striping to provide a safer crossing.

The image below shows a segment of the proposed trail system that will allow the kids in the surrounding neighborhoods safe access to the schools.

Tuesday, October 13, 2009

Mistletoe Marketplace

For the past few years we have been proud to work with the Junior League of Jackson assisting them with the tenant layout of the Mistletoe Marketplace event.  This years event will be held November 4-7, 2009.

Friday, October 9, 2009

Croswell Residence

The Township
Ridgeland, Mississippi
Land Planning & Landscape Architecture:  McCrory & Associates
Architecture:  Scott Morgan
Interior Design:  Rankin Interiors
Construction:  Win Foshee





Wednesday, October 7, 2009

Walk to School Day

Today was "Walk to School Day".  We walked with the students of Madison Avenue Elementary and were proud to see students walking even though there was a steady rain.


Over the next few years, we are looking forward to the increasing number of students that may choose to walk due to the Safe Routes to School program.

Tuesday, October 6, 2009

Supporting the Mississippi Wildlife Enforcement Officer's Association

Every year we are proud supporters of the Mississippi Wildlife Enforcement Officer's Association.

This is the graphic that will be diplayed in their new publications.

Monday, August 24, 2009

Adcock Outdoor Fireplace


I need to get a better picture of this.  It was taken a couple of days after a storm and with my iphone.

Wednesday, July 15, 2009

Mannsdale Park - Lot 1

Circle Seven Outpost and Provisions
Beagle Bagle Cafe
Madison, Mississippi
Client:  Will Pace
Land Planning & Landscape Architecture:  McCrory & Associates
Architect:  Scott Morgan